Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/arrowres/public_html/ajconstruction.com/media/foundry/3.1/libraries/cssmin.php on line 2236

AJC Director's Blog

My construction background includes 28 years of experience in technical training, supervision, project management, scheduling, and estimating on a wide variety of commercial, industrial, healthcare, and utilities projects.

It is here that we post various article on trends in the industry, various types of new construction we see in the industry and much more! Thank for reading and telling others about our web site blog!

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that have been used in the blog.
  • Bloggers
    Bloggers Search for your favorite blogger from this site.
  • Team Blogs
    Team Blogs Find your favorite team blogs here.
  • Login
    Login Login form

 

YOU ARE INVITED TO A SNEAK PEAK

OF FOUNDER'S HALL!

 

 

 

Sunday, January 22, 2017

During each worship service all worshipers will process to Founder’s Hall. We will place a Bible in the foundation of the stage and tour the space. Come see your COMMIT dollars at work and know that we are grateful for your generosity.

 

 

 

 

 

 

 

Hits: 3758
0

   

 

Hits: 3018
0

Posted by on in AJC Director's Blog

With exceptions to every rule... pricing of conceptual building plans for Owners is a pretty accurate science. The challenge is in pricing the cost of developing sites. Storm water, retention ponds, electrical and water service including fire lines gets complicated. This is where our services in analyzing sites for Owners is critical in purchasing property or in the earliest days of project development.

Hits: 4518
0

Posted by on in AJC Director's Blog

With a construction dude in the White House its time to get rid of Davis Bacon! Government Contracting needs to be done with AIA Contracts.

Hits: 4317
0

Posted by on in AJC Director's Blog

I create the conceptual budget based on the written scope of work. Fixed systems such as  Walls, foundations, roof, windows get designed early on and need to be priced in the conceptual design phase. the operating HVAC, electrical systems get designed next and need to be priced during the Design Development Phase. With nearly 80% of the cost of a project designed into a project during these two phases this is where we get it right based on the budget. If something is out of balance this is where we fix it.

Hits: 2859
0